Issue No. : 1
Issue
Date : November 2008
Project
No. : 768
Joint
User Complex and Wholesale Fish Market at Area 44, Tuen
Mun
Environmental
Monitoring
& Audit Report
(October 2008)
Prepared By:
Allied Environmental Consultants Ltd.
COMMERCIAL-IN-CONFIDENCE
Issue No. : 1
Issue
Date : November 2008
Project
No. : 768
Joint
User Complex and Wholesale Fish Market at Area 44, Tuen
Mun
Environmental
Monitoring
& Audit Report (October 2008)
Prepared By:
Allied Environmental Consultants Ltd.
COMMERCIAL-IN-CONFIDENCE
Author:
BSc(Hons) Msc
Checked: Approved:
Claudine Lee Grace Kwok
MSc MHKIEIA MHKIOA BEng(Hons) MHKIEIA MHKIOA
MISWA MIAIA MRAPA LEED AP
This report has been prepared by Allied
Environmental Consultants Limited with all reasonable skill, care and diligence
within the terms of the Agreement with the client, incorporating our General
Terms and Conditions of Business and taking account of the resources devoted to
it by agreement with the client.
We disclaim any responsibility to the
client and others in respect of any matters outside the scope of the above.
This report is confidential to the client
and we accept no responsibility of whatsoever nature to third parties to whom
this report, or any part thereof, is made known. Any such party relies upon the report at
their own risk.
Table of Contents 2
List of Tables 3
List of Figures 3
List of Appendices 3
EXECUTIVE SUMMARY 4
1. PROJECT BACKGROUND 5
1.1 Project Organization and Contact Personnel 5
2. SENSITIVE RECEIVERS 6
3. CONSTRUCTION WORKS & PROGRAMME 6
4. SUMMARY OF EM&A
REQUIREMENT 6
5. MONITORING METHODOLOGY 8
5.1 Monitoring Programme 8
5.2 Air Quality Monitoring 8
5.3 Noise Monitoring 9
6. RESULTS 9
6.1. Air Quality 9
6.2. Noise 10
6.3. Weather Conditions 10
7. SITE INSPECTION
& AUDIT 11
8. Non-compliance,
Complaints, Notifications of Summons and Successful Prosecutions 11
9. OTHERS 12
10. CONCLUSIONS 12
Table 1 Contact Details of Key Personnel
Table 2 Interrelationship between Construction
Activities and Mitigation Measures
Table 3 Action and Limit Level for Air
Quality Impact Monitoring at Yuet Wu Villa
Table 4 Action and Limit Levels for Construction
Noise Impact Monitoring
Table 5 Event
Action Plan
Table 6 Noise
Monitoring Equipment
Table 7 1-hour
TSP Monitoring Results
Table 8 24-hour
TSP Monitoring Results
Table 9 Noise
Monitoring Results
Table 10 Summary
of Weather Conditions during the Monitoring Period
Table 11 Summary of
Site Inspections
Figure 1 Site
Location Plan
Figure 2 Location
of Air Quality Monitoring Station
Figure 3 Location
of Noise Monitoring Station
Figure 4 Photos
of Air Quality Monitoring Station
Figure 5 Photos
of Noise Monitoring Station
Figure 6 Photos
of the Construction Site for the Junior Police Officers¡¦ Married Quarters
Appendix A Calibration
Record of High-Volume TSP Sampler
Appendix B Calibration
Certification of the Sound Level Meter and Calibrator
Appendix C Summary of 1-Hour TSP
Monitoring Record
Appendix D Summary of 24-Hour TSP
Monitoring Record
Appendix E Summary of Noise
Monitoring Record
Appendix F Wind Record from
Hong Kong Observatory
Appendix G Mitigation Measures
Implementation Schedule for Construction Stage
Allied
Environmental Consultants Limited (AEC) has been appointed to conduct an
environmental monitoring and audit (EM&A) program for
the proposed Joint User Complex and Wholesale Fish Market at Area 44, Tuen Mun. The construction works
was commenced on 31st July 2008. This report is
the third monthly EM&A report, which details the environmental monitoring
and audit results recorded during the period from 1st October 2008 to 31st
October 2008.
Impact environmental monitoring
for the proposed Joint User
Complex and Wholesale Fish Market at Area 44, Tuen Mun has been carried out on 4th,
10th, 16th, 22nd, and 28th October
2008 at Block 15, Yuet Wu Villa. Baseline
1-hr TSP and noise monitoring were conducted within the period of 0700-1900
hours, where baseline 24-hr TSP monitoring was conducted continuously for a
24-hour period.
1-hour TSP monitoring results
at the monitoring location ranged from 130£gg/m3 to 226£gg/m3 with an
average of 171£gg/m3. 24-hour TSP monitoring results ranged from 90£gg/m3
to 98£gg/m3 with an average of 93£gg/m3.
Noise
monitoring results at the monitoring location ranged from 61.2dB(A) to 62.7dB(A)
with an average of 61.9dB(A).
Based on the
monitoring results, the air quality and construction noise level shall comply
with the environmental requirements in EM&A Manual. There were no breaches
of the action and limit levels. There were no environmental complaints received
in the reporting month. No notification
of summons or prosecution was received.
Construction activities
to be undertaken in November 2008 include the continuation of jack piling,
drainage diversion, superstructure works, and a brief pre-boring. Potential
environmental impacts include dust generation from stockpiles of dusty
materials, the drainage diversion work, and pre-boring; noise from operation of
the equipments and jack piling; runoff from drainage diversion works, and
pre-boring; and the storage of various C&D and chemical wastes. The
Contractor should properly implement the required environmental mitigation
measures as per the implementation schedule in the EM&A manual to ensure no
significant adverse environmental impacts to be arisen from the construction
works. The Contractor was reminded to maintain good housekeeping throughout the
construction phase.
A Joint User
Complex and Wholesale Fish Market (WFM Complex) at Area
The subject site is located at Castle Peak
Bay of Tuen Mun given in Figure 1. The subject site is bounded to the north by a future local
open space presently used as a temporary car park, to the east by Castle Peak
Bay typhoon shelter, to the south by a future lorry park and to the west by Wu
Shan Road. Yuet Wu Villa being the nearest
residential establishment is located at around
Key personnel and contact particulars are summarized in Table 1.
Table 1 Contact
Details of Key Personnel
Role |
Department
/ Company |
Names |
Contact
Number |
Fax
Number |
Lead User
Department |
Agriculture,
Fisheries, and Conservation Department |
Mr. K.H. Chan Ms. Louise Li |
2150 7092 2150 7140 |
2314 2866 |
Environmental
Permit Holder |
Architecture
Services Department |
Mr. S.W. Chow Ms. Susana Chan |
2867 3716 2867 6706 |
2523 9622 |
Architect |
P&T
Architects and Engineers Ltd. |
Ms. Sarah Ng Ms. Vivian Law |
2835 3548 2832 3046 |
2891 3834 |
Main
Contractor |
W. Hing Construction Co. Ltd. |
Mr. Andy Chan Mr. Tim Wong |
9630 7404 6478 4623 |
8343-9188 |
Environmental
Team Leader |
Allied
Environmental Consultants Ltd. |
Ms. Grace
Kwok |
2815 7028 |
2815 5399 |
Independent
Environmental Checker |
Cinotech
Consultants Ltd. |
Mr. Alex
Ngai |
2151 2083 |
3107 1388 |
Air Sensitive Receivers (ASRs) within
Noise Sensitive Receivers (NSRs) within
The major works undertaken and/or completed during the
monitoring period are listed below:
-
Pre-boring works
-
Jack piling works
-
Drainage diversion works
Table 2 shows the interrelationship
between construction activities and environmental mitigation measures for the
reporting month.
Table 2 Interrelationship
between Construction Activities and Mitigation Measures
Construction
Works |
Major Environmental Impact |
Mitigation Measures |
Pre-boring |
Noise, air quality, and water quality
impacts |
Water spraying, avoided rainy days,
wastewater treated before discharging |
Jack piling |
Noise impact |
Well-maintained plants were used |
Drainage diversion |
Air quality, and water quality impacts |
Water spraying, avoided rainy days |
For regular
impact monitoring, the sampling frequency of at least once in every six-days,
shall be strictly observed at the monitoring station for 24-hr TSP
monitoring. For 1-hr TSP
monitoring, the sampling frequency of at least three times in every six-days
should be undertaken when the highest dust impact occurs. For noise monitoring,
one set of measurement between 0700-1900 hours on normal weekdays. Leq(30 min) shall be
used as the monitoring parameter.
From baseline monitoring results, the proposed Action and Limit Levels for air quality are summarized in
Table 3. The average baseline 1-hr TSP value of 129£gg/m3 and 24-hr TSP value of 65£gg/m3
measured at Block 15, Yuet Wu Villa was used to
determine the action and limit level for air quality impact monitoring. The
proposed Action and Limit Levels for construction noise are summarized in Table
4.
Table 3 Action
and Limit Level for Air Quality Impact Monitoring at Yuet Wu Villa
Parameters |
Baseline Level (£gg/m3) |
Action Level (£gg/m3) |
Limit Level (£gg/m3) |
24-Hour TSP Level |
65 |
173 |
260 |
1-Hour TSP Level |
129 |
334 |
500 |
Table 4
Action and Limit Levels for Construction Noise Impact Monitoring
Time
Period |
Action
Level |
Limit Level |
Daytime (0700-1900 hours) on weekdays |
When one documented compliant is received |
Dwelling 75dB(A)1 School 70dB(A)1 (65dB(A) during
examinations)1 |
1900-2300 on any day and 0700-2300 on
Sunday and general holidays, for use of PME2 |
When one documented compliant is received |
65dB(A)3 |
All days during the night-time (2300-0700
hours) 2 |
When one documented compliant is received |
50dB(A)3 |
Note: 1. Construction
noise criteria stipulated in the TM-EIAO
2. A Construction
Noise Permit (CNP) shall be required for the carrying out of the construction
work during the restricted hours (1900-2300 on any day
and 0700-2300 on Sunday and general holidays, for use of PME; and All days
during the night-time (2300-0700 hours))
3. Area sensitivity rating of the monitoring location
is ¡§B¡¨.
Should non-compliance of the above Action and Limit levels occurs, the
contractor shall undertake corresponding action in accordance with
the proposed Event Action Plan given in the EM&A Manual. A summarized
general Event Action Plan is given in Table 5. Details should be referred to
the Event Action Plan in the EM&A Manual.
Level |
Step
1 |
Step
2 |
Step
3 |
Action |
l Identify source l Check monitoring data and working methods |
l Contact project manager to discuss and
implement remedial action l Rectify any unacceptable practice l Amend working methods if appropriate l If exceedance continues, commence
additional monitoring |
l Notify client/project manager following
correct of the situation l Cease additional monitoring if exceedance
stops |
Limit |
l Identify source l Notify client/project manager l Check monitoring data and working methods l Repeat measurement to confirm finding l Commence additional monitoring |
l Take immediate action to avoid further
exceedance l Submit proposal for remedial actions to
client/project manager within 3 working days l Implement the agreed proposal l If exceedance continues, amend and
resubmit the proposal |
l Notify client/project manager following
correction of the situation l Cease additional monitoring if exceedance
stops |
Air quality monitoring and noise
monitoring were conducted at Block 15, Yuet Wu Villa on 4th, 10th,
16th, 22nd, and 28th October 2008. Air
quality monitoring station was set up at the roof top of the residential block
and noise monitoring was conducted at
A
construction site for the proposed Junior Police Officers' Married Quarters is
located at Wu Hong Street
which is 110m northwest from the monitoring location, which can be
a major source of the noise and TSP generation during the monitoring period. Figure 6 shows the photos of the construction site.
1-hour and 24-hour TSP air quality monitoring was conducted at the
designated air quality monitoring location using a High Volume TSP Sampler (Model No: Anderson GMWS-2310 ACCU-VOL) at the designated location. The Calibration Record of the High-Volume TSP
Sampler is given in Appendix A.
24-hour TSP samples were
taken every six days. 1-hour TSP samples were
taken three times a day between 0700-1900 hours.
Noise monitoring was conducted
at the designated noise monitoring location between 0700-1900 hours using a sound
level meter which complies with the International Electrotechnical
Commission Publications 651:1979 (Type 1) and 804:1985 (Type 1). Noise
instrumentation details are given in Table 6 and the Calibration Certificate for
the sound level meter and calibrator is given in Appendix B.
Table 6 Noise
Monitoring Equipment
Manufacturer |
Type/Model No. |
Equipment |
RION |
Model NL 31 |
Precision Sound Level Analyser
with windshield |
RION |
|
Calibrator |
Noise levels measurements
were recorded in terms of thirty minutes A-weighted equivalent continuous sound
pressure level (Leq(30min)) on a daily basis. The sound level meter was
calibrated immediately prior to and following each noise measurement. The meter
was mounted on a tripod at a height of
Noise measurements were not made in the presence of fog, rain, and wind
with a steady speed exceeding
1-hour and 24-hour TSP monitoring results are summarized in Table 7 and 8 and serve as the basis
for determining the action and limit levels. The minimum and maximum 1-hour TSP
measured at Yuet Wu Villa was 130£gg/m3 and 226£gg/m3 respectively with an average of 171£gg/m3.
The minimum and maximum 24-hour TSP measured was 90£gg/m3 and 98£gg/m3
respectively with an average of 91£gg/m3. Summary of air
quality monitoring record will be provided in Appendix
C and D.
Table
7 1-Hour
TSP Monitoring Results
Day |
Date |
1-hr TSP (£gg/m3) |
Average (£gg/m3) |
|||
|
|
|
Average |
|||
1 |
4 Oct 2008 |
154 |
171 |
172 |
166 |
171 |
2 |
10 Oct 2008 |
146 |
145 |
130 |
140 |
|
3 |
16 Oct 2008 |
171 |
168 |
183 |
174 |
|
4 |
22 Oct 2008 |
145 |
149 |
172 |
155 |
|
5 |
28 Oct 2008 |
209 |
226 |
222 |
219 |
Table 8 24-Hour
TSP Monitoring Results
Day |
Date |
24-hr TSP (£gg/m3) |
1 |
4 Oct 2008 |
91 |
2 |
10 Oct 2008 |
90 |
3 |
16 Oct 2008 |
92 |
4 |
22 Oct 2008 |
98 |
5 |
28 Oct 2008 |
94 |
|
Average |
93 |
Noise monitoring results in terms of Leq(30min),
L10(30min) L90(30min) measured at the designated noise
monitoring location are summarized in Table 9. L10 and L90
represent sound levels that are exceeded 10% and 90% of the time respectively.
Normally, L10 measurements can be considered as the average peak
levels, whilst L90 levels can be considered as the average
background noise levels.
During the reporting month, the minimum and maximum noise level measured at Yuet Wu
Villa was 61.2dB(A) Leq(30min)
and 62.7dB(A) Leq(30min) respectively
with an average of 61.9dB(A) Leq(30min).
No exceedance was recorded in this reporting period. Summary of noise monitoring record will be
provided in Appendix E.
Table 9 Noise
Monitoring Results
Day |
Date |
L10(30mins) (dB(A)) |
L90(30mins) (dB(A)) |
Leq(30mins) (dB(A)) |
1 |
4 Oct 2008 |
63.5 |
56.9 |
61.6 |
2 |
10 Oct 2008 |
64.3 |
57.0 |
62.1 |
3 |
16 Oct 2008 |
64.9 |
59.6 |
62.7 |
4 |
22 Oct 2008 |
63.5 |
58.5 |
61.7 |
5 |
28 Oct 2008 |
63.5 |
57.9 |
61.2 |
|
Average |
63.9 |
58.0 |
61.9 |
Weather data of the monitoring station were obtained from the nearest
Hong Kong Observatory (HKO) Tuen Mun
automatic weather station located at Tuen Mun Town Park (63 mPD). Table 10 summarizes
the wind data during the monitoring dates. Wind record from HKO will be shown in Appendix F.
Table 10 Summary
of Weather Conditions during the Monitoring Period
Date |
Weather |
Prevailing
Wind direction |
Daily Average
Wind speed (m/s) |
4 Oct 2008 |
Sunny |
SE |
4.22 |
10 Oct 2008 |
Sunny |
N |
1.87 |
16 Oct 2008 |
Sunny |
NE |
1.45 |
22 Oct 2008 |
Sunny |
S |
2.07 |
28 Oct 2008 |
Sunny |
SE |
2.67 |
5 site
inspections were conducted by the Environmental Team (ET) in this reported
period. Major observations by the ET, actions by the Contractor and outcome are
summarized in the Table 11.
Table 11 Summary
of Site Inspections
|
Date |
Observations |
Action taken by Contractor |
Outcome |
1 |
|
No outstanding observations during
inspection. |
Contractor is required to keep up with
the mitigation measures. |
|
2 |
|
Exposed surface was not properly covered. |
Exposed surface was properly covered. |
The situation is rectified on 15 Oct. |
3 |
|
No outstanding observations during
inspection. |
Contractor is required to keep up with
the mitigation measures. |
|
4 |
|
No outstanding observations during
inspection. |
Contractor is required to keep up with
the mitigation measures. |
|
5 |
|
An oil drums were placed on bare land. |
Contractor is required to provide drip
tray for oildrums. |
The situation is rectified immediately. |
In this reporting
period, no complaint, inspection notice, notification of summons
or prosecution was received. No non-compliance was recorded.
287.3 tonnes of
inert C&D waste was disposed at public fill. 3.68 tonnes of waste was
disposed to landfill. No chemical waste was transported off site in this
reported period.
Environmental monitoring
has been carried out for the proposed Joint User Complex and Wholesale Fish Market at Area 44, Tuen Mun. 1-hour and 24-hour
TSP air quality monitoring and noise monitoring was conducted at Block 15, Yuet Wu Villa during the period from 1st October
2008 to 31st October 2008.
The average 1-hour
TSP level is 171£gg/m3 and average 24-hour
TSP level is 93£gg/m3. For impact noise monitoring,
the 30-minute average noise
level is 61.9dB(A) .