Issue No. : 1
Issue
Date : November 2008
Project No. : 768
Joint User Complex and Wholesale Fish Market at Area
44, Tuen Mun
Environmental
Monitoring
& Audit Report
(August 2008 ¡V October 2008)
Prepared By:
Allied Environmental Consultants Ltd.
COMMERCIAL-IN-CONFIDENCE
Issue No. : 1
Issue Date : November 2008
Project No. : 768
Joint
User Complex and Wholesale Fish Market at Area 44, Tuen Mun
Environmental
Monitoring
& Audit Report
(August 2008 ¡V October
2008)
Prepared By:
Allied Environmental Consultants Ltd.
COMMERCIAL-IN-CONFIDENCE
Author:
BSc(Hons) Msc
Checked: Approved:
Claudine Lee Grace Kwok
MSc MHKIEIA MHKIOA BEng(Hons) MHKIEIA
MHKIOA
MISWA MIAIA MRAPA LEED AP
This report has been prepared by Allied
Environmental Consultants Limited with all reasonable skill, care and diligence
within the terms of the Agreement with the client, incorporating our General
Terms and Conditions of Business and taking account of the resources devoted to
it by agreement with the client.
We disclaim any responsibility to the
client and others in respect of any matters outside the scope of the above.
This report is confidential to the client
and we accept no responsibility of whatsoever nature to third parties to whom
this report, or any part thereof, is made known. Any such party relies upon the report at
their own risk.
Table of Contents i
List of Tables ii
List of Figures ii
List of Appendices ii
EXECUTIVE SUMMARY 1
1. PROJECT BACKGROUND 2
1.1 Project Organization and Contact Personnel 2
2. SENSITIVE RECEIVERS 3
3. SUMMARY OF EM&A
REQUIREMENT 3
4. MONITORING METHODOLOGY 5
4.1 Monitoring Programme 5
4.2 Air Quality Monitoring 5
4.3 Noise Monitoring 5
5. RESULTS 6
5.1. Air Quality 6
5.2. Noise 6
5.3 Weather
Conitions 6
6. SITE INSPECTION
& AUDIT 7
7. Non-compliance,
Complaints, Notifications of Summons and Successful Prosecutions 8
8. OTHERS 8
9. RECOMMENDATIONS AND CONCLUSIONS 9
9.1. Recommendations 9
9.2. Conclusions 9
Table 1 Contact Details of
Key Personnel
Table
2 Action
and Limit Level for Air Quality Impact Monitoring at Yuet Wu Villa
Table 3 Action and Limit Levels for Construction
Noise Impact Monitoring
Table 4 Event
Action Plan
Table 5 Noise
Monitoring Equipment
Table 6 Summary
of Weather Conditions during the Monitoring Period
Table 7 Summary
of Site Inspections
Figure 1 Site
Location Plan
Figure 2 Location
of Air Quality Monitoring Station
Figure 3 Location
of Noise Monitoring Station
Figure 4 Photos
of Air Quality Monitoring Station
Figure 5 Photos
of Noise Monitoring Station
Figure 6 Photos
of Construction Site for Junior Police
Officers' Married Quarters
Appendix A Calibration
Record of High-Volume TSP Sampler
Appendix B Calibration
Certification of the Sound Level Meter and Calibrator
Appendix C Summary and Graphical
Plot of 1-Hour TSP Monitoring Record
Appendix D Summary and Graphical
Plot of 24-Hour TSP Monitoring Record
Appendix E Summary and
Graphical Plot of Noise Monitoring Record
Appendix F Wind Record from
Hong Kong Observatory
Appendix G Mitigation
Measures Implementation Schedule for Construction Stage
Allied Environmental Consultants Limited (AEC) has been
appointed to conduct an environmental monitoring and audit (EM&A) program for the proposed Joint User Complex and Wholesale Fish Market at Area
44, Tuen Mun. The construction works was commenced on 31st July
2008. This report is the first quarterly EM&A report, which summarizes
the environmental monitoring and audit results recorded during the period from
31st July 2008 to 31st October 2008.
Based on the monitoring results, the air
quality and construction noise level complied with the environmental
requirements in EM&A Manual. There were no environmental complaints received
in this quarter. No notification
of summons or prosecution was received.
Construction activities undertaken from August
2008 to October 2008 included jack piling, pre-boring, drainage diversion, and
some internal finishing. Potential environmental impacts include dust
generation from stockpiles of dusty materials, the drainage diversion work, and
pre-boring; noise from operation of the equipments and jack piling; runoff from
drainage diversion works, and pre-boring; and the storage of various C&D and
chemical wastes. The Contractor should properly implement the required
environmental mitigation measures as per the implementation schedule in the
EM&A manual to ensure no significant adverse environmental impacts to be
arisen from the construction works. The Contractor was reminded to maintain
good housekeeping throughout the construction phase.
A Joint User
Complex and Wholesale Fish Market (WFM Complex) at Area
The subject site is located at Castle Peak
Bay of Tuen Mun given in Figure 1. The subject site is bounded to the north by a future local
open space presently used as a temporary car park, to the east by Castle Peak
Bay typhoon shelter, to the south by a future lorry park and to the west by Wu
Shan Road. Yuet Wu Villa being the nearest residential establishment is located
at around
Key personnel and contact particulars are summarized in Table 1.
Table
1 Contact Details of Key Personnel
Role |
Department
/ Company |
Names |
Contact
Number |
Fax
Number |
Lead User
Department |
Agriculture,
Fisheries, and Conservation Department |
Mr. K.H. Chan Ms. Louise Li |
2150 7092 2150 7140 |
2314 2866 |
Environmental
Permit Holder |
Architecture
Services Department |
Mr. S.W. Chow Ms. Susana Chan |
2867 3716 2867 6706 |
2523 9622 |
Architect |
P&T
Architects and Engineers Ltd. |
Ms. Sarah Ng Ms. Vivian Law |
2835 3548 2832 3046 |
2891 3834 |
Main
Contractor |
W. Hing
Construction Co. Ltd. |
Mr. Andy Chan Mr. Tim Wong |
9630 7404 6478 4623 |
8343-9188 |
Environmental
Team Leader |
Allied
Environmental Consultants Ltd. |
Ms. Grace
Kwok |
2815 7028 |
2815 5399 |
Independent
Environmental Checker |
Cinotech
Consultants Ltd. |
Mr. Alex
Ngai |
2151 2083 |
3107 1388 |
Air Sensitive Receivers (ASRs) within
Noise Sensitive Receivers (NSRs) within
For regular
impact monitoring, the sampling frequency of at least once in every six-days,
shall be strictly observed at the monitoring station for 24-hr TSP
monitoring. For 1-hr TSP
monitoring, the sampling frequency of at least three times in every six-days
should be undertaken when the highest dust impact occurs. For noise monitoring,
one set of measurement between 0700-1900 hours on normal weekdays. Leq(30 min) shall be used as the monitoring parameter.
From baseline monitoring results, the proposed Action and Limit Levels for air quality are summarized in Table
2. The
average baseline 1-hr TSP value of 129£gg/m3 and
24-hr TSP value of 65£gg/m3
measured at Block 15, Yuet Wu Villa was used to determine the action and limit
level for air quality impact monitoring. The proposed Action and Limit Levels
for construction noise are summarized in Table 3.
Table 2 Action
and Limit Level for Air Quality Impact Monitoring at Yuet Wu Villa
Parameters |
Baseline Level (£gg/m3) |
Action Level (£gg/m3) |
Limit Level (£gg/m3) |
24 Hour TSP Level |
65 |
173 |
260 |
1 Hour TSP Level |
129 |
334 |
500 |
Table
3 Action and Limit Levels for Construction Noise
Impact Monitoring
Time
Period |
Action
Level |
Limit Level |
Daytime (0700-1900 hours) on weekdays |
When one documented compliant is received |
Dwelling 75dB(A)1 School 70dB(A)1 (65dB(A) during
examinations)1 |
1900-2300 on any day and 0700-2300 on Sunday
and general holidays, for use of PME2 |
When one documented compliant is received |
65dB(A)3 |
All days during the night-time (2300-0700
hours) 2 |
When one documented compliant is received |
50dB(A)3 |
Note: 1. Construction
noise criteria stipulated in the TM-EIAO
2. A Construction
Noise Permit (CNP) shall be required for the carrying out of the construction
work during the restricted hours (1900-2300 on any day
and 0700-2300 on Sunday and general holidays, for use of PME; and All days
during the night-time (2300-0700 hours))
3. Area sensitivity rating of the monitoring location
is ¡§B¡¨.
Should non-compliance of the above Action and Limit levels occurs, the
contractor shall undertake corresponding in accordance with the proposed Event
Action Plan given in EM&A Manual. A summarized general Event Action Plan is
given in Table 4. Details should be referred to the Event Action Plan in the EM&A
Manual.
Table4 Event
Action Plan
Level |
Step 1 |
Step 2 |
Step 3 |
Action |
l Identify source l Check monitoring data and working methods |
l Contact project manager to discuss and
implement remedial action l Rectify any unacceptable practice l Amend working methods if appropriate l If exceedance continues, commence
additional monitoring |
l Notify client/project manager following
correct of the situation l Cease additional monitoring if exceedance
stops |
Limit |
l Identify source l Notify client/project manager l Check monitoring data and working methods l Repeat measurement to confirm finding l Commence additional monitoring |
l Take immediate action to avoid further exceedance l Submit proposal for remedial actions to
client/project manager within 3 working days l Implement the agreed proposal l If exceedance continues, amend and
resubmit the proposal |
l Notify client/project manager following
correction of the situation l Cease additional monitoring if exceedance
stops |
Air quality monitoring and
noise monitoring were conducted at Block 15, Yuet Wu Villa. Air
quality monitoring station was set up at the roof top of the residential block
and noise monitoring was conducted at
A
construction site for the proposed Junior Police Officers' Married Quarters is
located at
1-hour and 24-hour TSP air quality monitoring was conducted at the
designated air quality monitoring location using a High Volume TSP Sampler (Model No: Anderson GMWS-2310 ACCU-VOL) at the designated location. The Calibration Record of the High-Volume TSP
Sampler is given in Appendix A.
24-hour TSP samples were
taken every six days. 1-hour TSP samples were
taken three times a day between 0700-1900 hours.
Noise monitoring was
conducted at the designated noise monitoring location between 0700-1900 hours
using a sound level meter which complies with the International
Electrotechnical Commission Publications 651:1979 (Type 1) and 804:1985 (Type
1). Noise instrumentation details are given in Table 5 and the Calibration
Certificate for the sound level meter and calibrator is given in Appendix B.
Table
5 Noise Monitoring Equipment
Manufacturer |
Type/Model No. |
Equipment |
RION |
Model NL 31 |
Precision Sound Level Analyzer with windshield |
RION |
|
Calibrator |
Noise levels
measurements were recorded in terms of thirty minutes A-weighted equivalent
continuous sound pressure level (Leq(30min)) on a weekly basis. The sound level
meter was calibrated immediately prior to and following each noise measurement.
The meter was mounted on a tripod at a height of
Noise measurements were not made in the presence of fog, rain, and wind
with a steady speed exceeding
No exceedance was recorded in this quarter. Summary and graphical plots of
air quality monitoring record of 1-hour TSP levels and 24-hour TSP levels are
provided in Appendices C and
D.
Noise monitoring results in terms of Leq(30min), L10(30min)
L90(30min) were measured at the designated noise monitoring
location. L10 and L90 represent sound levels that are
exceeded 10% and 90% of the time respectively. Normally, L10
measurements can be considered as the average peak levels, whilst L90
levels can be considered as the average background noise levels.
No exceedance was recorded in this quarter. Summary of noise monitoring record is
provided in Appendix E.
Weather data of the monitoring station were obtained from the nearest
Hong Kong Observatory (HKO) Tuen Mun automatic weather station located at Tuen
Mun Town Park (63 mPD).Table
6 summarizes the wind data during the monitoring dates.
Wind record from HKO will be shown in Appendix F.
Table 6 Summary of Weather
Conditions during the Monitoring Period
Date |
Weather |
Prevailing Wind Direction |
Daily Average Wind Speed (m/s) |
1 Aug 2008 |
Cloudy |
SSE |
2.71 |
7 Aug 2008 |
Cloudy |
SSE |
4.47 |
13 Aug 2008 |
Sunny |
SW |
1.96 |
19 Aug 2008 |
Sunny |
SSE |
2.68 |
25 Aug 2008 |
Sunny |
SSE |
3.54 |
30 Aug 2008 |
Sunny |
SW |
1.94 |
5 Sept 2008 |
Sunny |
S |
1.78 |
11 Sept 2008 |
Sunny |
NW |
1.78 |
17 Sept 2008 |
Sunny |
SE |
2.03 |
23 Sept 2008 |
Cloudy |
N |
3.51 |
29 Sept 2008 |
Sunny |
NE |
4.14 |
4 Oct 2008 |
Sunny |
SE |
4.42 |
10 Oct 2008 |
Sunny |
N |
1.87 |
16 Oct 2008 |
Sunny |
NE |
1.45 |
22 Oct 2008 |
Sunny |
S |
2.07 |
28 Oct 2008 |
Sunny |
SE |
2.67 |
Weekly site
inspections were carried out by representatives of the ET. Sixteen site inspections
were conducted on 5th, 12th, 19th, and 26th
August; 5th, 12th, 17th, 23rd, and
30th September; and 2nd, 10th, 17th,
23rd, and 31st October. The major findings are summarized
in Table 7.
The mitigation
measures undertaken by the Contractor are effective in minimizing the
environmental impact; however, the Contractor should implement these mitigation
measures more effectively in order to prevent causing further significant
impact to the environment.
Table 7 Summary of Site Inspections
Date |
Observations |
Action taken by contractor |
Outcome |
|
Some stagnant water observed on site
after raining |
To clean up the stagnant water
immediately |
The situation is rectified immediately |
|
Some stagnant water observed on site
after raining |
To clean up the stagnant water
immediately |
The situation is rectified immediately |
|
Construction waste and debris on site. |
To be removed, collected, and send to
appropriate destinations. |
The situation is rectified immediately. |
|
Some stagnant water observed on site. |
To clean up the stagnant water
immediately |
The situation is rectified immediately |
|
Stagnant water observed on site. |
Stagnant water is cleaned up immediately. |
The situation is rectified immediately. |
|
Rubbish found on site. |
Rubbish was cleared immediately. |
The situation is rectified immediately. |
|
Two oil drums were placed on bare land. Rubbish found on site |
Drip tray is placed immediately. Rubbish was cleared immediately. |
The situation is rectified immediately. |
|
Most fuel drums were placed on bare land. Exposed surface was not properly covered
by tarpaulin sheet. |
Drip tray is placed immediately. Exposed surface is covered immediately. |
The situation is rectified immediately. |
|
An oil drum was placed on bare land. Exposed surface was not properly covered
by tarpaulin sheet. |
Drip tray is placed immediately. Exposed surface is covered immediately. |
The situation is rectified immediately. |
2/10/2008 |
No outstanding
observations during inspection. |
Contractor is
required to keep with the mitigation measures. |
|
10/10/2008 |
Exposed
surface was not properly covered. |
Exposed
surface was properly covered. |
The situation
is retified on 15 Oct. |
17/10/2008 |
No outstanding
observations during inspection. |
Contractor is
required to keep up with the mitigation measures. |
|
23/10/2008 |
No outstanding
observations during inspection. |
Contractor is
required to keep up with the mitigation measures. |
|
31/10/2008 |
Oil drums were
placed on bare land. |
Contractor is
required to keep up with the mitigation measures. |
The situation
is rectified immediately. |
During site inspections in the reporting month, no non-conformance of implementation
of environmental mitigation measures was identified. All environmental mitigation measures for construction
stages stated in approved EIA Report, EM&A Manual and Environmental Permit
shall be carried out throughout the whole construction period as shown in Appendix G.
In this quarter, no complaints, inspection notices, and notifications of summons or
prosecution were received.
941.6 tonnes of
inert C&D waste was disposed at public fill. 13.48 tonnes of waste was
disposed to landfill. No chemical waste was transported off site in this quarter.
In accordance with
the environmental site audits undertaken during the report quarter, the
following recommendations are made:
¡P
Drip trays should be used for storing the fuel drum
and it should be clean up regularly to prevent any leakage;
¡P
Stagnant water should be cleared immediately;
¡P
Exposed surface should be compacted or covered at all
times; and
¡P
Rubbish should be put in the rubbish bin and should
not be found anywhere else within the Site.
The ET will keep tract on the EM&A programme to ensure compliance of
environmental requirements and the proper implementation of all necessary
mitigation measures.
Environmental monitoring
has been carried out for the proposed Joint User Complex and Wholesale Fish Market at Area 44, Tuen Mun. 1-hour and 24-hour TSP air quality monitoring and noise monitoring was
conducted at Block 15, Yuet Wu Villa during the period from 31st
July 2008 to 31st October 2008, in accordance with EM&A Manual
and the requirement under Environmental Permit (No. EP-296/2007). All
monitoring results were checked and reviewed. 48 sets of 1-hour
TSP level monitoring, 16 sets of 24-hour TSP level monitoring,
and 16 sets of noise monitoring were carried out during the reporting period.
No exceedance of any of the monitoring data was recorded. No environmental complaints and notification of
summons or prosecution were received during the reporting period.